Marcos opens first segment of Davao bypass

Marcos opens first segment of Davao bypass project

President Ferdinand Marcos, Jr opened the 7.5-km Segment A of the P46.8-billion…

Panguil Bay Bridge to open in June 2024

Construction of the 3.17-kilometer Panguil Bay Bridge Project is now at 69%…
Davao’s longest road mountain tunnel project in full swing

Davao’s longest road mountain tunnel project in full swing

Tunneling activities for the 2.3-kilometer twin tube bi-lane road mountain tunnel, a…

Marcos launches Bataan-Cavite bridge project

The P175.6-billion Bataan-Cavite Interlink Bridge (BCIB) connecting Central Luzon and Calabarzon was…
32km Cavite-Bataan bridge to be built starting this year

32km Cavite-Bataan bridge to be built starting this year

A cable-stayed bridge across Manila Bay that will cut travel time between…
NLEX Connector España section to open on Mar 27

NLEX Connector España section to open on Mar 27

The first section of NLEX Connector between Caloocan and España interchanges will…

CLLEX 25km segment may be fully operational by mid-2023

A section of the Central Luzon Link Expressway that connects Tarlac and…

Widening of Plaridel Bypass Road eyed for 2023 completion

Widening of Arterial (Plaridel) Bypass Road linking North Luzon Expressway and the…
DTI, DOTr and DPWH sign pacts to improve logistics infra

DTI, DOTr and DPWH sign pacts to improve logistics infra

The Department of Trade and Industry signed agreements with the Department of…

Panay-Guimaras-Negros bridges engineering design works to start in Q1 2023

Detailed engineering design work on the P187.54 billion Panay-Guimaras-Negros Island Bridges Project…