Marcos inaugurates 7.88‑KM CALAX Biñan-Gen Trias segment

Marcos inaugurates 7.88 km CALAX Biñan-Gen Trias segment

The new 7.88-kilometer stretch of the Cavite-Laguna Expressway was inaugurated on May…
MPTC partners with SMC to build P72B CBEX, NBEX

MPTC partners with SMC to build P72B CBEX, NBEX

• Metro Pacific Tollways Corp and San Miguel Corp have teamed up…

CALAX’s Laguna side fully opened, Cavite segment works begin

Following the full opening of the Laguna section, MPCALA Holdings, Inc., a…